Cornelius I Series Wartungshandbuch Seite 36

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 66
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 35
33 TD 204
I SERIES
SEQUENCE OF OPERATION
When the on off clean switch is pushed to the on position the com-
pressor will start after a 2 second delay. The fan motor and pump are
delayed. The condenser fan motor on integral air cooled unites will
start when the condenser temperature rises to approximately 38° C.
The water pump will start when the suction line temperature reaches
approximately 4°C. Temperature information is transmitted to the
control board thru thermistor sensors. The unit is now in the freeze
cycle. If after approximately 6 minutes of operation the suction line
temperature is not below 4.4°C, the unit will shut down and show an
error light on the control board. When the harvesting set point tem-
perature is reached, the circuit board will switch to the harvest cycle.
At the start of the harvest cycle the condenser fan motor will shut off
and the Dump Valve and Hot Gas Valve will open. The Water Pump
will shut down in approximately 15 seconds. Harvest will continue
for approximately 90 seconds. when the Ice is harvested the evapo-
rator curtain opens and closes breaking a magnetic field of the evap-
orator proximity switch which signals the circuit board to switch
back to the Freeze Cycle.
When the Evaporator Curtain is held open, in the freeze cycle,
breaking the Evaporator Switch Magnetic Field for 5 to 8 seconds,
the circuit board is signaled that a full bin condition has been
reached , and shuts down the unit.
COMPONENT FUNCTIONS
Circuit Board
The circuit board controls the operation of the Ice Maker through in-
formation it receives from Thermistor Sensors and Proximity (mag-
netic) Switches.
Seitenansicht 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 65 66

Kommentare zu diesen Handbüchern

Keine Kommentare